Running an in-house ecommerce studio without measuring throughput is like running a factory without tracking units per hour. You may feel busy, but you can't prove productivity or spot problems early.
The four metrics that matter
- Assets per day (APD) — final, published assets per 8-hour studio day.
- Cost per asset (CPA) — total studio cost divided by assets shipped.
- Cycle time — days from shoot to live on site.
- Rework rate — percent of assets sent back for revisions.
Healthy benchmarks
For apparel and accessories: 80–150 APD per shooter, CPA of $6–$14, cycle time under 5 days, rework rate below 8%. If you're outside these ranges, you likely have bottlenecks in culling, editing, or approvals.
Finding your bottleneck
Track time-in-stage for each asset. The stage where assets sit longest is your bottleneck. Fix it, then measure again — the bottleneck will have moved.
Every studio has a bottleneck. Your job isn't to eliminate it, it's to move it somewhere less painful.
Dashboards that work
Axion11's studio dashboard surfaces all four metrics in real time. See the platform.